Maritime
Project of dredging Cai Mep Thi Vai channel
PROJECT INTRODUCTION
-
PROJECT OWNER Maritime Project Management Unit
-
LOCATION Ho Chi Minh City, Ba Ria – Vung Tau Province
-
SCALE Renovation and upgrading the channel from buoy "0" to the Cai Mep container port area with a length of 46.6km for ships of up to 200,0000 tons or larger.
-
KEY CONSULTING SERVICES Surveys, preparing feasibility study report, conducting numerical model, ship simulation model studies, basic design, detailed design.