Maritime

Project of dredging Cai Mep Thi Vai channel

PROJECT INTRODUCTION

  • PROJECT OWNER Maritime Project Management Unit
  • LOCATION Ho Chi Minh City, Ba Ria – Vung Tau Province
  • SCALE Renovation and upgrading the channel from buoy "0" to the Cai Mep container port area with a length of 46.6km for ships of up to 200,0000 tons or larger.
  • KEY CONSULTING SERVICES Surveys, preparing feasibility study report, conducting numerical model, ship simulation model studies, basic design, detailed design.
Phone