Maritime

LIEN CHIEU PORT

PROJECT INTRODUCTION

  • PROJECT OWNER Danang Priority Infrastructure Investment Projects Management Unit and Investors
  • LOCATION Lien Chieu district, Hai Phong City
  • SCALE Seawall and breakwater with a length of 1.170m, a channel with a width of 160m, bottom elevation of -14m CD; starting berth with a total length of 750m accommodating 100,000 DWT vessels, Container vessels of 6,000 – 8,000 TEUs, throughput capacity of 5 MMTPA.
  • KEY CONSULTING SERVICES Surveys, preparing master plans, feasibility study report, basic design and detailed design.