Maritime

NEW BA SON SHIPYARD

PROJECT INTRODUCTION

  • PROJECT OWNER Project Management Unit 9 - General Department of Defense Industry
  • LOCATION Phu My town, Ba Ria – Vung Tau province.
  • SCALE Area of 95ha; berth length of 1,385m; ship-lift platform of 4,500T; capable of repairing 150,000 DWT ships; building of 70,000 DWT ships; throughput capacity of building 10 ships/year, repairing 70 ships/year.
  • KEY CONSULTING SERVICES Surveys, preparing master plans, pre-feasibility study report; feasibility study report, basic design and detailed design.
Phone