JETTY NO. 3,4 HAI PHONG INTERNA- TIONAL GATEWAY PORT

Client:

Port of Hai Phong Joint Stock Company

Location:

Cat Hai District, Hai Phong

Scale: 

The project covers an area of 54ha; the berth length is 750m, accommodating container ships up to 100,000DWT; capacity of 1.1 million TEU/ year.

Main consultancy services: 

Survey, preparing master plan, feasibility study report and basic design

SOAI RAP CHANNEL (PHASE 2)

16/02/2022

Client: Project Management Unit for dredging of Soai Rap channel (Phase 2)

Chi tiết

HOA PHAT - DUNG QUAT STEEL DEDICATED PORT

24/03/2022

Client: Hoa Phat Steel Joint Stock Company – Dung Quat

Chi tiết

VAN PHONG BONDED PETROLEUM TERMINAL

16/02/2022

Client: Van Phong Bonded Petroleum Terminal Joint Venture Company Limited

Chi tiết