PROJECT OF DREDGING CAI MEP THI VAI CHANNEL

Client:

Maritime Project Management Unit;

Location:

Ho Chi Minh city, Ba Ria - Vung Tau.

Scale: 

Renovate and upgrade the channel from buoy "0" to the Cai Mep container port area with a length of 46.6km for ships up to 200,0000 tons or larger.

Main consultancy services: 

Surveys, preparing feasibility study report, researching the numerical model, ship simulation model, basic design, detailed design.