PROJECT OF DREDGING CAI MEP THI VAI CHANNEL

Client:
Maritime Project Management Unit;
Location:
Ho Chi Minh city, Ba Ria - Vung Tau.
Scale:
Renovate and upgrade the channel from buoy "0" to the Cai Mep container port area with a length of 46.6km for ships up to 200,0000 tons or larger.
Main consultancy services:
Surveys, preparing feasibility study report, researching the numerical model, ship simulation model, basic design, detailed design.

SOAI RAP CHANNEL (PHASE 2)
16/02/2022
Client: Project Management Unit for dredging of Soai Rap channel (Phase 2)

CAI MEP THUONG CONTAINER TERMINAL (TCCT & TCIT)
15/02/2022
Client: Sai Gon Newport Corporation

HOA PHAT - DUNG QUAT STEEL DEDICATED PORT
24/03/2022
Client: Hoa Phat Steel Joint Stock Company – Dung Quat
