LIEN CHIEU PORT

Client:

Danang Priority Infrastructure Investment Project Management Unit and investors

Location:

Lien Chieu district, Da Nang

Scale: 

Wave protection revetment and breakwater with length of 1,170m; navigation channel width of 160 m, bottom elevation of -14mCD; start-up berth with length of 750m for 100,000 DWT vessels, container ships from 6,000 - 8,000 TEU, capacity of 5 million tons/year

Main consultancy services: 

Survey, preparing master plan, feasibility study report, basic design and detailed design