BERAKWATER FOR BEN DINH PORT (LY SON IS- LAND)

Client:
Quang Ngai Province Traffic Construction Investment Project Management Board
Location:
Ly Son district, Quang Ngai province
Scale:
The total length of the breakwater is 450m to protect the Ben Dinh port area.
Main consultancy services:
Surveys, researching the numerical model, preparing feasibility study report, basic design and detailed design.

LIEN CHIEU PORT
15/02/2022
Chủ đầu tư: Ban Quản lý các dự án đầu tư cơ sở hạ tầng ưu tiên TP. Đà Nẵng và các nhà đầu tư

SOAI RAP CHANNEL (PHASE 2)
16/02/2022
Client: Project Management Unit for dredging of Soai Rap channel (Phase 2)

