BERAKWATER FOR BEN DINH PORT (LY SON IS- LAND)

Client:

Quang Ngai Province Traffic Construction Investment Project Management Board

Location:

Ly Son district, Quang Ngai province

Scale: 

The total length of the breakwater is 450m to protect the Ben Dinh port area.

Main consultancy services: 

Surveys, researching the numerical model, preparing feasibility study report, basic design and detailed design.

SOAI RAP CHANNEL (PHASE 2)

16/02/2022

Client: Project Management Unit for dredging of Soai Rap channel (Phase 2)

Chi tiết

CAI MEP THUONG CONTAINER TERMINAL (TCCT & TCIT)

15/02/2022

Client: Sai Gon Newport Corporation

Chi tiết

TIEN SA PORT

15/02/2022

Client: Da Nang Port Joint Stock Company

Chi tiết