VINH TAN 3 THERMAL POWER PLANT

Client:

Vinh Tan 3 Energy Joint Stock Company

Location:

Tuy Phong district, Binh Thuan province

Scale: 

01 coal unloading jetty of 100,000 DWT and 01 general cargo unloading jetty for 3,000DWT vessels; basic dredging in the common channel section for 100,000DWT vessels

Main consultancy services: 

Survey, preparing master plan, basic design

PORT AND ANCHORAGE AT BACH LONG VI ISLAND

16/02/2022

Location: Bach Long Vi Island

Chi tiết

VINH TAN 3 THERMAL POWER PLANT

16/02/2022

Client: Vinh Tan 3 Energy Joint Stock Company

Chi tiết

HOA PHAT - DUNG QUAT STEEL DEDICATED PORT

24/03/2022

Client: Hoa Phat Steel Joint Stock Company – Dung Quat

Chi tiết