GENERAL DEVELOP- MENT PLAN OF VIET-NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050

GENERAL DEVELOP- MENT PLAN OF VIET- NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050
Client:
Ministry of Transport, Vietnam Maritime Administration
Location:
Nationwide
Main consultancy services:
In charge of implementing survey, preparing master plan
THE DETAILED MAS- TER PLAN FOR GROUPS OF SEAPORTS, PORTS, WHARVES, FLOATING DOCKS, BERTH POCK- ETS AND WATER AREAS FOR THE PERIOD 2021- 2030, VISION TO 2050
Client:
Ministry of Transport, Vietnam Maritime Administration
Location:
Nationwide
Main consultancy services:
In charge of implementing survey, preparing master plan
PREPARATION OF DE- VELOPMENT PLAN OF DRY PORT SYSTEM IN PE- RIOD OF 2021 - 2030, VI- SION TO 2050.
Client:
Ministry of Transport, Vietnam Maritime Administration
Location:
Nationwide
Main consultancy services:
The consortium for conducting surveys and masterplans

SON MY LNG PORT
Chủ đầu tư: Công ty TNHH Kho cảng LNG Sơn Mỹ Địa điểm/vị trí: Huyện Hàm Tân, tỉnh Bình Thuận. Quy mô: Đê chắn sóng dài 1.425m; luồng tàu rộng 250m; cao độ đáy -15,5mHĐ; bến cảng giai đoạn 1 có chiều dài 360m tiếp nhận tàu LNG Q-flex đến 123.000DWT (217.000m3); công suất 3,6…

BERAKWATER FOR BEN DINH PORT (LY SON IS- LAND)
Chủ đầu tư: Ban quản lý dự án đầu tư xây dựng các công trình giao thông tỉnh Quảng Ngãi Địa điểm/vị trí: huyện Lý Sơn, tỉnh Quảng Ngãi Quy mô: Tổng chiều dài đê chắn sóng 450m bảo vệ ổn định khu vực cảng Bến Đình Dịch vụ tư vấn chính: Khảo sát, nghiên…

