GENERAL DEVELOP- MENT PLAN OF VIET-NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050

GENERAL DEVELOP- MENT PLAN OF VIET- NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050

Client:

Ministry of Transport, Vietnam Maritime Administration

Location:

Nationwide

Main consultancy services: 

In charge of implementing survey, preparing master plan

THE DETAILED MAS- TER PLAN FOR GROUPS OF SEAPORTS, PORTS, WHARVES, FLOATING DOCKS, BERTH POCK- ETS AND WATER AREAS FOR THE PERIOD 2021- 2030, VISION TO 2050

Client:

Ministry of Transport, Vietnam Maritime Administration

Location:

Nationwide

Main consultancy services:

In charge of implementing survey, preparing master plan

PREPARATION OF DE- VELOPMENT PLAN OF DRY PORT SYSTEM IN PE- RIOD OF 2021 - 2030, VI- SION TO 2050.

Client:

Ministry of Transport, Vietnam Maritime Administration

Location:

Nationwide

Main consultancy services: 

The consortium for conducting surveys and masterplans

BERTH 7, 8 OF HAI PHONG INTERNATION- AL GATEWAY PORT

14/07/2023

Chủ đầu tư: Công ty TNHH MTV Tổng công ty Tân cảng Sài Gòn Địa điểm/vị trí: Huyện Cát Hải, Thành phố Hải Phòng Quy mô:  Diện tích 80ha; chiều dài bến 900m tiếp nhận tàu Container đến 18.000TEU; bến sà lan chiều dài 200m cho tàu 160TEU; công suất 1,9 triệu TEU/năm Dịch vụ…

Chi tiết

CAN THO RIVER DIKE PROJECT

14/07/2023

Chủ đầu tư: Ban Quản lý Dự án Đầu tư Xây dựng Thành phố Cần Thơ Địa điểm/vị trí: Quận Cái Răng, Thành phố Cần Thơ Quy mô:  Tuyến kè bảo vệ bờ trái dài 4.781m;  Hệ thống hạ tầng kỹ thuật, công trình kiến trúc sau kè. Dịch vụ tư vấn chính:  Khảo sát, thiết…

Chi tiết

LNG PORT

14/07/2023

Chủ đầu tư: Công ty TNHH Hải Linh Địa điểm/vị trí: Thị xã Phú Mỹ, Tỉnh Bà Rịa – Vũng Tàu Quy mô:  Chiều dài bến 394,2m, tiếp nhận tàu LNG 100.000DWT Dịch vụ tư vấn chính:  Khảo sát, thiết kế bản vẽ thi công nâng cấp, giám sát thi công.

Chi tiết