GENERAL DEVELOP- MENT PLAN OF VIET-NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050

GENERAL DEVELOP- MENT PLAN OF VIET- NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050
Client:
Ministry of Transport, Vietnam Maritime Administration
Location:
Nationwide
Main consultancy services:
In charge of implementing survey, preparing master plan
THE DETAILED MAS- TER PLAN FOR GROUPS OF SEAPORTS, PORTS, WHARVES, FLOATING DOCKS, BERTH POCK- ETS AND WATER AREAS FOR THE PERIOD 2021- 2030, VISION TO 2050
Client:
Ministry of Transport, Vietnam Maritime Administration
Location:
Nationwide
Main consultancy services:
In charge of implementing survey, preparing master plan
PREPARATION OF DE- VELOPMENT PLAN OF DRY PORT SYSTEM IN PE- RIOD OF 2021 - 2030, VI- SION TO 2050.
Client:
Ministry of Transport, Vietnam Maritime Administration
Location:
Nationwide
Main consultancy services:
The consortium for conducting surveys and masterplans

PROJECT OF DREDGING CAI MEP THI VAI CHANNEL
Chủ đầu tư: Ban quản lý dự án hàng hải Địa điểm/vị trí: Thành phố Hồ Chí Minh, Tỉnh Bà Rịa – Vũng Tàu Quy mô: Cải tạo, nâng cấp tuyến luồng từ phao số “0” vào khu bến cảng container Cái Mép chiều dài 46,6km cho tàu đến 200.0000 tấn hoặc lớn hơn. Dịch…

JETTY NO. 3,4 HAI PHONG INTERNA- TIONAL GATEWAY PORT
Client: Port of Hai Phong Joint Stock Company

HOA PHAT - DUNG QUAT STEEL DEDICATED PORT
Client: Hoa Phat Steel Joint Stock Company – Dung Quat