GENERAL DEVELOP- MENT PLAN OF VIET-NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050

GENERAL DEVELOP- MENT PLAN OF VIET- NAM’S SEAPORT SYSTEM IN PERIOD OF 2021- 2030, VISION TO 2050

Client:

Ministry of Transport, Vietnam Maritime Administration

Location:

Nationwide

Main consultancy services: 

In charge of implementing survey, preparing master plan

THE DETAILED MAS- TER PLAN FOR GROUPS OF SEAPORTS, PORTS, WHARVES, FLOATING DOCKS, BERTH POCK- ETS AND WATER AREAS FOR THE PERIOD 2021- 2030, VISION TO 2050

Client:

Ministry of Transport, Vietnam Maritime Administration

Location:

Nationwide

Main consultancy services:

In charge of implementing survey, preparing master plan

PREPARATION OF DE- VELOPMENT PLAN OF DRY PORT SYSTEM IN PE- RIOD OF 2021 - 2030, VI- SION TO 2050.

Client:

Ministry of Transport, Vietnam Maritime Administration

Location:

Nationwide

Main consultancy services: 

The consortium for conducting surveys and masterplans

PROJECT OF DREDGING CAI MEP THI VAI CHANNEL

14/07/2023

Chủ đầu tư: Ban quản lý dự án hàng hải Địa điểm/vị trí: Thành phố Hồ Chí Minh, Tỉnh  Bà Rịa – Vũng Tàu Quy mô:  Cải tạo, nâng cấp tuyến luồng từ phao số “0” vào khu bến cảng container Cái Mép chiều dài 46,6km cho tàu đến 200.0000 tấn hoặc lớn hơn. Dịch…

Chi tiết

PORT OF NGHI SON REFINERY AND PETROCHEMICAL PLANT

16/02/2022

Client: Nghi Son Refinery & Petrochemical Limited Liability Company

Chi tiết

WIND POWER INTEGRATE WITH DESALINATION

16/02/2022

Client: IAE and SUL (Kingdom of Belgium)

Chi tiết