LOCK SERVING FISHERY LOGISTICS AND STORM SHELTER

Location:
Truong Sa archipelago
Scale:
A lock capable of storing 97 vessels; shore protection revetment of 1,353m, breakwater of 2,536m
Main consultancy services:
Preparing master plan, FS report, basic design and detailed design

SOAI RAP CHANNEL (PHASE 2)
16/02/2022
Client: Project Management Unit for dredging of Soai Rap channel (Phase 2)