WIND POWER INTEGRATE WITH DESALINATION

Client:

IAE and SUL (Kingdom of Belgium)

Location:

An Hai commune, Ninh Phuoc district, Ninh Thuan province and the Mekong Delta

Scale: 

Wind turbine system with capacity up to 300kW, Reverse Osmosis (RO) desalination system with capacity of 20m3/day

Main consultancy services: 

Research, proposing project location; designing infrastructure works.

CAI MEP THUONG CONTAINER TERMINAL (TCCT & TCIT)

15/02/2022

Client: Sai Gon Newport Corporation

Chi tiết

NAM TIEN PHONG INDUSTRIAL ZONE

16/02/2022

Client: Deep C Russia Joint Stock Company (DCRU)

Chi tiết

TAY NINH LOGISTICS CENTER, DRY PORT AND MULTIPURPOSE TERMI- NAL.

16/02/2022

Client: Tay Ninh International Logistics Corporation

Chi tiết