NEW BA SON SHIPYARD

Client:

Project Management Unit 9 - General Department of Military Industries and Manufacture

Location:

Phu My town, Ba Ria - Vung Tau province

Scale: 

Area of 95ha; berth length of 1,385m; platform of 4,500T; capable of repairing 150,000 DWT ships; building of 70,000 DWT ships; capacity of building 10 ships/year, repairing 70 ships/year.

Main consultancy services: 

Survey, preparing master plan, pre- feasibility study report; feasibility study report, basic design and detailed design.

VAN PHONG BONDED PETROLEUM TERMINAL

16/02/2022

Client: Van Phong Bonded Petroleum Terminal Joint Venture Company Limited

Chi tiết

DINH VU PORT

16/02/2022

Client: Port of Hai Phong Joint Stock Company and investors

Chi tiết

PROJECT OF DREDGING CAI MEP THI VAI CHANNEL

14/07/2023

Chủ đầu tư: Ban quản lý dự án hàng hải Địa điểm/vị trí: Thành phố Hồ Chí Minh, Tỉnh  Bà Rịa – Vũng Tàu Quy mô:  Cải tạo, nâng cấp tuyến luồng từ phao số “0” vào khu bến cảng container Cái Mép chiều dài 46,6km cho tàu đến 200.0000 tấn hoặc lớn hơn. Dịch…

Chi tiết