NEW BA SON SHIPYARD

Client:
Project Management Unit 9 - General Department of Military Industries and Manufacture
Location:
Phu My town, Ba Ria - Vung Tau province
Scale:
Area of 95ha; berth length of 1,385m; platform of 4,500T; capable of repairing 150,000 DWT ships; building of 70,000 DWT ships; capacity of building 10 ships/year, repairing 70 ships/year.
Main consultancy services:
Survey, preparing master plan, pre- feasibility study report; feasibility study report, basic design and detailed design.

XUAN CAU INDUSTRIAL AND NON-TARIFF ZONE
16/02/2022
Client: Xuan Cau - Lach Huyen Investment Joint Stock Company

BAC TIEN PHONG INDUSTRIAL ZONE
16/02/2022
Client: Bac Tien Phong Industrial Zone Joint Stock Company (BTPIZ)

SOAI RAP CHANNEL (PHASE 2)
16/02/2022
Client: Project Management Unit for dredging of Soai Rap channel (Phase 2)